![]() |
![]() |
![]() |
A project completed,,, installation was made with the help of Craig and Mark Brown of Brown Signs in Paris, TN. Craig is working from the bucket and Mark on the ladder. The large logo on the new church building is the largest of it's kind that we know of, and is the largest aluminum construction project we have done at Elliott Design to date. We appreciate the confidence Pastor Harrell Nations and his congregation placed in us to create the finishing touch to their 2.3 million dollar building addition. |
Project under
construction for the
First United Methodist Church of Brownsville, TN These preliminary photos shows the construction type and materials used for this "flame and cross" UMC logo.All aluminum construction, with 3/16" thick 1-1/2" angle framework, handcrafted and TIG welded. Faces and side returns are .080 aluminum sheet, notched and hand formed over the framework. UMC logo size, 8'4" wide x 16' tall. |
|
|
|
|
![]() Finished "Flames" ready for installation |
![]() Close-up of interior framing, many notch cuts were made to form the framework into the flame shape. |
NOTICE:
if
you have arrived here through clicking a link from a SEARCH ENGINE listing, you
may be missing a lot
of our design samples, use this link to go to
Elliott Sign & Design
Home Page to view our complete web site.
©1998-2010 All images,
design/layouts and
artworks are the
copyrighted property of Elliott Sign & Design, all rights reserved.